−01The assignment

Sirdal municipality is building a new pedestrian and cycle bridge across the Sira at Tonstad. It is a four-span composite bridge with a total length of approx. 107 m and a longest span of approx. 30 m.

−02Geoteknia’s role

Geotechnical design of the bridge foundations for Degree of Freedom AS.

−03Technical challenges

The bridge rests on concrete footings on in-situ sand and gravel. River piers are cast in sheet-pile cofferdams with top of footing approx. 0.3 m below the final riverbed. Abutments are excavated with open slopes.